The assignment
Configuration for process conditions
The process conditions required a specific configuration that had to be ready for immediate use after installation for the customer in the Middle East.
The assignment
The process conditions required a specific configuration that had to be ready for immediate use after installation for the customer in the Middle East.
Douna's contribution
Douna configured and built the two units and performed flow testing and calibration at its own site, with the client present.
The result
Two units configured, tested and calibrated for the customer, delivered for the intended process conditions.
The client was present at Douna during flow testing and calibration.